Location : Home>News>Corporate News
Time : 2021-12-08Pageviews : 529
On November 6, after nearly a month of pre-commissioning, Huaneng’s first geothermal energy heating project, the Dezhou Geothermal Clean Heating Demonstration Project, was officially launched. The heating was realized 9 days in advance, which opened up the company’s clean and low-carbon heating technology application. New way.
The project was designed and constructed by Qingneng Institute and is located in Lingcheng District, Dezhou City, Shandong Province. The project started geothermal well drilling in June this year, with a depth of more than 1,400 meters, a water output temperature of 53 degrees Celsius, a water output of 98 cubic meters per hour, and a heating area of 71,000 square meters. After the project is put into operation, it is equivalent to saving 1,536 tons of standard coal and reducing carbon dioxide by 3829 tons every year, effectively solving the local clean heating problem.
The project adheres to the development method of "filling with fixed production and balanced production and irrigation". According to the characteristics of heat storage, geothermal wells are constructed with large-diameter gravel filling and directional cement cementing technology. Features such as continuous monitoring. The heating station and equipment have realized modularization, automatic operation, energy saving and high efficiency.
As a clean, high-efficiency, low-carbon renewable energy, geothermal energy has huge resource potential, good environmental protection and economic benefits, especially in Shandong, Hebei, Shanxi, Shaanxi and other places in my country. It has broad application prospects.